sb.scorecardresearch

Delhi Election

Camlin
Visuals of ISRO's Gaganyaan Crew Module.

Published 17:24 IST, October 16th 2023

ISRO gears up for Gaganyaan mission's first unmanned flight test

ISRO to conduct unmanned flight tests for Gaganyaan mission, including vital Crew Module and Escape Systems trials, ensuring crew safety and mission success.

Follow: Google News Icon
  • share
Expand image icon Description of the image

1/7: India's Gaganyaan mission: ISRO is gearing up for unmanned flight tests, Abort Mission-1 (TV-D1) on October 21, 2023, 7-9 am, from Sriharikota. / Image: ISRO

Expand image icon Description of the image

2/7: ISRO engineers designed the Crew Module (CM) for Gaganyaan, prioritising crew safety. TV-D1 CM, unpressurised yet crucial, mirrors the envisioned manned-module, housing vital recovery systems. / Image: ISRO

Expand image icon Description of the image

3/7: CM avionics in dual redundant mode is essential for critical functions, extensive instrumentation aboard the CM will be used to collect flight data. / Image: ISRO

Expand image icon Description of the image

4/7: The Indian Navy will recover the CM in the Bay of Bengal following the module's return. / Image: ISRO

Expand image icon Description of the image

5/7: Test Vehicle, custom-built for abort mission, will carry CM and Crew Escape Systems with fast-acting solid motors, which are crucial for the mach 1.2 simulation. / Image: ISRO

Expand image icon Description of the image

6/7: At 17 km, CES and CM will part ways, triggering an orchestrated abort sequence. Safe splashdown as per ISRO would be anywhere near 10 km off Sriharikota coast in the Bay of Bengal. / Image: ISRO

Expand image icon Description of the image

7/7: CM is being tested in the Bengaluru ISRO facility, and was subsequently dispatched on August 13. The Module has been undergoing vibration tests and pre-integration for final Launch-Pad integration. / Image: ISRO

Updated 17:24 IST, October 16th 2023